This file is from Wikimedia Commons and may be used by other projects.
The description on its file description page there is shown below.
Summary
DescriptionGrimsel Baustelle Dia 247-16298.jpg
Deutsch: Ausbau der Kavernenzentrale Grimsel (heute 2018 Grimsel I) beim Sommerloch unterhalb der Spittellamm-Staumauer; die vorgesehene Machinengruppe mit einer Doppel-Peltonturbine wird eine Leistung von 35 MW erbringen; links der Mitte: Standseilbahn-Trassee zum 1941-43 erbauten Artilleriewerks Grimsel.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the licence, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible licence as the original.
This file contains additional information, probably added from the digital camera or scanner used to create or digitise it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Copyright holder
ETH-Bibliothek Zürich, Bildarchiv / Fotograf: Wehrli, Leo / Dia_247-16298 / CC BY-SA 4.0
Short title
Grimselzentrale Baustelle am Fuss des Grimselsee-Staumauer
Author
Wehrli-Frey, Anna Margaretha, Kolorist
Image title
Ausbau der Kavernenzentrale Grimsel (heute 2018 Grimsel I) beim Sommerloch unterhalb der Spittellamm-Staumauer; die vorgesehene Machinengruppe mit einer Doppel-Peltonturbine wird eine Leistung von 35 MW erbringen; links der Mitte: Standseilbahn-Trassee zum 1941-43 erbauten Artilleriewerks Grimsel. Kolorierung des Dias durch Margrit Wehrli-Frey